The aim of this project is to achieve the maximum possible short-term energy efficiency improvement. The Project would result in significant cost-savings for both the Company (LTE) and the end-consumers expecting through Energy efficiency and modernisation of heating distribution assets and optimisation of operations, mainly by the introduction of IHSs
- Introduction of natural gas fired mini-CHPs (2x6MW electricity), with a heat generation capacity of 15 th MWh
- Pipeline replacement – main transmission lines and distribution network and
- Remote monitoring, control and optimisation programme.
Main investments concern
- Introduction of mini CHPs
- Monitoring and optimisation programme
- Replacement of distribution pipelines
- Replacement of pipelines connected to IHSs