You are here

Improvement of the infrastructure for radioactive waste management in the Chernobyl Exclusion Zone. Phase I: Safety assessment. U4.01/08 - B

The scope of the contract is the design of interim storage facilities (ISFs) that are intended to provide long term storage for long-lived intermediate level waste (LL-ILW), high level waste (HLW) and vitrified, heat generating high level waste (vit-HLW). The radioactive waste to be stored will include that generated as a result of the building works of the Chernobyl Shelter and the dismantling operations of units 1 to 3 of the Chernobyl nuclear facility.

Theme:

Type of cooperation:

Beneficiary country:

Start date: 
2010
Amount of support (M€): 
0.5
Loan or Grant: 
Grant
Further funds (M€): 
N/A

Sponsoring Agency or Donor: