Kramatorsk municipal electric transport power substation modernization

The main expected results of the project implementation are the following: power consumption reduced for the public electric transport system's own needs by about 10% that will assist the general CO2 emmissions reduction; the electric public transport of Kramatorsk operational capacity is secured. The existing equipment has a high breakdown rate due to its high depreciation and long operational lifetime; a communication plan for dissemination of the Project implementation experience is developed and implemented.

Theme:

Type of cooperation:

Beneficiary country:

Start date: 
2015
End date: 
2017
Amount of support (M€): 
1.0
Loan or Grant: 
Grant