You are here
DemoUkrainaDH - Ternopil
The project of "Ternopilmiskteplokomunenergo" includes installation of individual heating substations, enabling control of heat supply in relation to outdoor temperature and billing Ternopil hosptial webbased on metered consumption, in all buildings (about 25) not already equipped with individual heating substations in a defined heating area. The area is supplied from a boiler house, presently equipped with gas-fired boilers. As a result of the measures two central heating substations can be closed down and the heat supply to the area will be a 2-pipe system with preparation of hot water in each building.