Complex (Consolidated) Safety Upgrade Program of Power Units of Nuclear Power Plants: Implementation of Containment Forced Depressurization System, Package /Measure No. 167/16205

The State Enterprise “National Nuclear Energy Generating Company “Energoatom”, hereinafter referred to as “the Purchaser”, intends to use a part of the loan proceeds from the European Bank for Reconstruction and Development and the European Atomic Energy Community (hereinafter referred to as “Euratom”) to cover the costs of the Project “Complex (Consolidated) Safety Upgrade Program of Power Units of Nuclear Power Plants”. Lot 1: Supply of Containment Forced Depressurization equipment, including technical documentation, manufacturing, Preliminary, Factory Acceptance and Handover Acceptance Tests at the Manufacturer’s site, delivery, participation in the incoming control, special training of the Purchaser’s personnel, installation supervision and adjustment monitoring, participation in the Preliminary Integrated Tests within the Nuclear Facility at the Purchaser’s site prior to commissioning into trial operation at the Purchaser’s Site,  trial operation, participation in the Acceptance Tests within the Nuclear Facility prior to commissioning into commercial operation and warranty maintenance within the warranty period (for more detailed information see the Technical Requirements – for  Rivne NPP, power unit 4 and Khmelnytska NPP, power unit 2 of SE “NNEGC “Energoatom”. Lot 2: Supply of Containment Forced Depressurization equipment, including technical documentation, manufacturing, Preliminary, Factory Acceptance and Handover Acceptance Tests at the Manufacturer’s site, delivery, participation in the incoming control, special training of the Purchaser’s personnel, installation supervision and adjustment monitoring, participation in the Preliminary Integrated Tests within the  Nuclear Facility at the Purchaser’s site prior to commissioning into trial operation at the Purchaser’s Site, trial operation, participation in the Acceptance Tests within the Nuclear Facility prior to commissioning into commercial operation and warranty maintenance within the warranty period (for more detailed information see the Technical Requirements – for Zaporizhzhya NPP, power unit 6 of SE “NNEGC “Energoatom”.

Theme:

Beneficiary country:

Start date: 
2018
End date: 
2020
Amount of support (M€): 
8,7
Loan or Grant: 
Loan

Sponsoring Agency or Donor: