You are here

Complex (Consolidated) Safety Upgrade Prog of Power Units of NPP: Package/Measure No133/14101-16201,Lot1: Instrumentation during/after an accident, Lot2: Introduce system to monitor hydrogen concentration in containment for beyond design basis accidents

The State Enterprise “National Nuclear Energy Generating Company “Energoatom”, hereinafter referred to as “the Purchaser”, intends to use a part of the loan proceeds from the European Bank for Reconstruction and Development and the European Atomic Energy Community (hereinafter referred to as “Euratom”) to cover the costs of the Project “Complex (Consolidated) Safety Upgrade Program of Power Units of Nuclear Power Plants”. Measure No.14101 “Instrumentation during and after an accident”, which includes purchase of: Equipment of the post-accident monitoring system (PAMS), including emergency instrumentation and control hardware for the KhNPP Power Units No.1, 2. Measure No.16201 “Introduce the system to monitor hydrogen concentration in the containment for beyond design basis accidents”, which includes purchase of: HCMS equipment for the KhNPP Power Units No.1, 2.

Theme:

Beneficiary country:

Start date: 
2017
End date: 
2020
Amount of support (M€): 
3,54

Sponsoring Agency or Donor: